Turnkey Package Comparison

Compare four residential construction packages. Rates and allowances are indicative, subject to site assessment, approved drawings and the final itemised quotation. Applicable taxes are additional.

01 Package overview and pricing

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Theme
Practical, complete construction
Better everyday comfort
Refined finishes and selected interiors
Bespoke design and coordinated interiors

Target client
Budget-conscious families and rental-home owners
Families seeking balanced quality and cost
Homeowners building a personalized residence
Owners seeking a distinctive villa or luxury home

Tagline
Practical finishes. Complete construction. A controlled budget.
Better everyday finishes for your family home.
Refined design with selected interiors included.
Bespoke design with coordinated interiors and selected technology.

Indicative lower rate (INR/sq ft)
1750
1950
2300
3000
Proposed Indore budgeting rates. Validate local procurement, labour, scope and margin before offering a firm price.
Indicative upper rate (INR/sq ft)
1950
2200
2750
4500
Signature Luxury may exceed INR 4,500/sq ft. Final price is by detailed bespoke quotation.
Taxes
Additional
Additional
Additional
Additional
Applicable taxes are additional and shown separately in the quotation. All monetary allowances in this document exclude applicable taxes.
Final pricing
Approved drawings and itemized scope
Approved drawings and itemized scope
Approved drawings and itemized scope
Detailed bespoke quotation

Initial pricing basis
Conditional
Conditional
Conditional
Conditional
New G/G+1 residential construction in Indore; approximately 1,500-2,500 sq ft total built-up area, normal access and conventional foundations confirmed by soil investigation.
Quantity basis
One dwelling
One dwelling
One dwelling
One dwelling
Initial budget assumes one dwelling, one kitchen and up to three bathrooms. Final room counts, dimensions and quantities must be recorded in the signed quotation.
Package progression
Replacement basis
Replacement basis
Replacement basis
Replacement basis
Higher-tier finishes and allowances replace lower-tier specifications. They do not accumulate or duplicate the same allowance.
Unique selling proposition
Essential functionality with a clearly defined finish budget.
Practical upgrades focused on daily use and comfort.
Construction and selected interiors coordinated under one contract.
Architecture, interiors and selected technology planned together.

Website enquiry button
Get My Essential Home Estimate
Plan My Comfort Home
Customize My Premium Home
Book My Signature Home Consultation

02 Planning, design and approvals

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Requirements discussion
Included
Included
Included
Included
Family needs, budget, room requirements, intended use and contracted future-floor requirements.
Site survey
Included
Included
Included
Included
Site measurements and levels for the agreed plot. Surveys beyond the agreed site survey are excluded.
Soil investigation
Included
Included
Included
Included
Investigation by a competent laboratory, with scope determined for the project. Results inform foundation selection.
Floor-plan design
Functional layout
Personalized family layout
Detailed space planning
Bespoke architectural planning

Furniture layout
Included
Included
Included
Included
Indicative 2D furniture layout coordinated with room use.
Floor-plan revision rounds
2
3
4
5
One round is one consolidated set of homeowner comments before drawing approval.
Front elevation
One concept
Two concepts; one finalized
Customized facade concept
Bespoke facade and material study

Final exterior renders
1
2
3
4
Essential: one front view. Other tiers: agreed exterior views.
Structural design
Included
Included
Included
Included
Design and drawings by a qualified structural engineer for the floors and use expressly contracted.
Electrical drawings
Included
Included
Included
Included
Layouts, circuit coordination and signed electrical point schedule.
Plumbing drawings
Included
Included
Included
Included
Water supply, drainage and service routes.
Execution details
Included
Included
Included
Included
Staircase, door/window and essential construction details. Architectural, structural and services drawings coordinated before execution.
Approval assistance
Included
Included
Included
Included
Approval drawing preparation and submission coordination. Fees, deposits, charges and approval guarantees are excluded.
Interior planning
Furniture layout
Furniture and service coordination
Living-room and kitchen design
Whole-home design for contracted rooms

Interior renders
Excluded
Excluded
Living room and kitchen
Up to six agreed spaces

Digital walkthrough
Optional
Optional
Optional
One agreed walkthrough

Material selection assistance
Approved selection list
Coordinated finish selections
Material board for principal spaces
Room-wise material boards

Design exclusions
Excluded
Excluded
Excluded
Excluded
Land-title verification, legal due diligence, ownership disputes, land-use conversion, subdivision, regularization, exceptional permissions and designs beyond contracted future floors.
Changes after approval
Variation
Variation
Variation
Variation
Redesign after approval, procurement or structural execution requires a written cost/time variation unless expressly included.

03 Structure and civil works

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Site establishment
Included
Included
Included
Included
Setting-out, normal site organization, construction equipment, scaffolding and safety arrangements for contracted work.
Excavation
Included
Included
Included
Included
Conventional excavation and backfilling to approved foundation drawings. Depth and quantities established before final quotation.
Foundations
Included
Included
Included
Included
Engineered conventional footings where suitable. Foundation type determined from soil investigation and structural requirements.
Backfilling
Included
Included
Included
Included
Approved fill placed and compacted appropriately. No uncontrolled debris filling.
RCC structure
Included
Included
Included
Included
Columns, beams, slabs, staircase and structural elements shown in approved drawings.
Reinforcement
Included
Included
Included
Included
Compliant approved TMT steel. Grade, diameter, spacing, laps and quantities are determined by the structural engineer.
Concrete
Included
Included
Included
Included
Specified grade and approved mix with appropriate placement, compaction, curing and testing.
Cement
Included
Included
Included
Included
UltraTech, JK Super, ACC or another specifically approved compliant product suitable for the work.
Masonry
Included
Included
Included
Included
Approved red bricks, fly-ash bricks or AAC blocks. Material and wall thicknesses follow approved drawings.
Aggregates and sand
Included
Included
Included
Included
Suitable graded aggregates and approved sand meeting project specifications.
Plastering
Included
Included
Included
Included
Internal and external plaster, surface preparation, service-chase and relevant junction treatment.
Damp-proofing
Included
Included
Included
Included
Appropriate damp-proof course and treatment at identified moisture-sensitive locations.
Anti-termite treatment
Included
Included
Included
Included
Pre-construction soil treatment at foundation/plinth stages by an approved applicator.
Roof drainage
Included
Included
Included
Included
Terrace slopes, outlets and rainwater downpipes as designed.
Parapets
Included
Included
Included
Included
Standard parapets shown in architectural and structural drawings.
Quality tests
Included
Included
Included
Included
Concrete and relevant material tests, pre-pour checks, waterproofing and service tests under the agreed inspection plan.
Structural-quality basis
Same requirement
Same requirement
Same requirement
Same requirement
Structural adequacy and essential protection are consistent across all tiers. Decorative finish budgets do not determine engineering requirements.
Floor-to-floor assumption
10 ft 6 in
10 ft 6 in
10 ft 6 in
10 ft 6 in
Approximately 10 ft 6 in for initial costing. Clear room height depends on slabs, beams, flooring and ceilings.
Plinth level
Design-specific
Design-specific
Design-specific
Design-specific
Finalized from road levels, drainage, site conditions and approved drawings.
Special height/structure
Separate costing
Separate costing
Separate costing
Separate costing
Taller floors, increased plinth, double-height spaces, long spans, cantilevers and flat slabs require specific costing.
Structural exclusions
Excluded
Excluded
Excluded
Excluded
Basements, piles, rafts outside quoted conventional scope, ground improvement, retaining structures, rock breaking, groundwater management and adjoining-building strengthening.
Special foundation work
Pre-agreed variation
Pre-agreed variation
Pre-agreed variation
Pre-agreed variation
Necessary special foundation scope is priced after soil findings and before construction begins.

04 Flooring, wall tiles and stone

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Main flooring material (INR/sq ft)
50
75
110
180
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Bathroom floor material (INR/sq ft)
40
60
85
130
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Bathroom wall material (INR/sq ft)
40
60
85
130
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Balcony/utility floor material (INR/sq ft)
40
50
70
100
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Covered parking floor material (INR/sq ft)
40
50
65
90
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Kitchen backsplash material (INR/sq ft)
40
60
85
130
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Staircase stone/tile material (INR/sq ft)
100
140
200
300
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Kitchen counter material (INR/sq ft)
100
150
220
350
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Specified sill/jamb stone (INR/sq ft)
90
120
170
250
Material-only allowance per actual finished surface area. Standard installation is included separately in construction price.
Standard installation
Included
Included
Included
Included
Substrate preparation, standard bedding/adhesive, laying, skirting, grouting and standard staircase edge finishing.
Wet-area flooring
Included
Included
Included
Included
Anti-skid selections for wet areas.
Kitchen backsplash height
2 ft
2 ft
2 ft
2 ft
Up to 2 ft above the counter.
Bathroom wall tiling height
Up to 7 ft
Up to 7 ft
Up to 9 ft
Up to 9 ft
Subject to actual room height and approved bathroom schedule.
Utility wall tiling
Scheduled area
Scheduled area
Scheduled area
Scheduled area
Only within the area and height identified in the finish schedule.
Terrace finish tiles
Optional
Optional
Optional
Optional
Excluded unless separately listed. Terrace waterproofing remains included.
Flooring exclusions
Excluded
Excluded
Excluded
Excluded
Imported marble, bookmatched stone, mosaics, intricate patterns, specialist polishing, extra substrate strengthening, specialist installation and selections above allowance.
Facade stone
Allowance/extra
Allowance/extra
Allowance/extra
Allowance/extra
Stone cladding outside the decorative facade allowance is extra.
Brand selection
Within allowance
Within allowance
Within allowance
Within allowance
Allowance does not mean every product from a named brand is available within budget.

05 Doors, windows and hardware

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Main entrance installed allowance (INR)
25000
40000
65000
100000
One main entrance per dwelling; includes frame, shutter, standard hardware, finish and installation.
Main-door treatment
Laminated flush door
Upgraded laminate/selected wood finish
Veneer/engineered wood treatment
Bespoke treatment within allowance

Internal door installed allowance (INR/door)
10000
15000
22000
30000
Includes frame, shutter, standard hardware, finish and installation. Count per signed opening schedule.
Bathroom door installed allowance (INR/door)
8000
10000
15000
20000
Includes frame, shutter, standard hardware, finish and installation.
Bathroom door system
WPC/suitable moisture-resistant
WPC/suitable moisture-resistant
Upgraded moisture-resistant system
Selected premium moisture-resistant system

Window system
Standard aluminium
Upgraded aluminium/uPVC
Selected premium aluminium/uPVC
Engineered aluminium/uPVC

Window installed allowance (INR/sq ft)
400
550
750
1100
Per actual opening area. Record profile, glazing, thickness, hardware, mesh and installation specification.
Budgeted window area / built-up area
10%
12%
15%
18%
Approved design and necessary ventilation take precedence. Price excess opening area before signing.
Mosquito mesh
Included
Included
Included
Included
Included in specified operable windows.
Door-height assumption
7 ft
7 ft
Up to 8 ft
Up to 8 ft

Safety glazing
Design requirement
Design requirement
Design requirement
Design requirement
Selected where required by design.
Door/window exclusions
Excluded
Excluded
Excluded
Excluded
Oversized pivot doors, imported systems, curtain walls, acoustic glazing, double glazing unless specified, motorized openings and separate pooja doors.

06 Kitchen construction and cabinetry

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Kitchen count
1
1
1
1
Additional kitchens or utility cabinetry are extra.
Counter length limit (running ft)
12
15
18
20
Up to stated length, standard depth up to 2 ft.
Counter depth limit (ft)
2
2
2
2
Greater depth and islands require specific costing.
Counter support
As detailed
As detailed
Coordinated with cabinetry
Coordinated with cabinetry
Appropriate masonry/board support as specified.
Sink material allowance (INR)
3000
5000
8000
15000
Standard installation included.
Sink tap material allowance (INR)
1500
2500
4000
7500
Standard installation included.
Kitchen appliance points
Included
Included
Included
Included
RO, chimney, refrigerator and appliance points per agreed schedule. Equipment excluded.
Kitchen cabinetry installed allowance (INR)
Excluded
Excluded
150000
300000
Materials, standard hardware, labour and finish included. Appliances and countertop are outside this cabinetry allowance.
Cabinet finish
Not included
Not included
Laminate
Selected laminate/veneer/finish within allowance

Cabinet internal accessories
Not included
Not included
Standard agreed set
Upgraded agreed set

Cabinetry drawing requirements
Signed schedule
Signed schedule
Signed schedule
Signed schedule
Record base/overhead lengths, carcass/shutter materials, edges, wet-area detail, hardware brand/model, drawers, baskets, hinges, handles and installation.
Kitchen exclusions
Excluded
Excluded
Excluded
Excluded
Hob, chimney, dishwasher, refrigerator, microwave, oven, purifier, island unless priced, extra kitchens, imported accessories above allowance and gas connection/bank.
No duplicate counter allowance
Separate budgets
Separate budgets
Separate budgets
Separate budgets
Kitchen-counter allowance is separate. Cabinetry does not include the countertop again.

07 Bathrooms, plumbing and sanitaryware

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Water distribution
Included
Included
Included
Included
Concealed cold/hot-water lines as drawn, using suitable approved CPVC/PPR or other specified system.
Drainage
Included
Included
Included
Included
SWR pipes, traps, ventilation and rainwater pipes. Internal chambers to agreed plot-boundary discharge point.
Service connections
Included
Included
Included
Included
Geyser provisions and sink, washing-machine and purifier connections at agreed locations.
Valves and access
Included
Included
Included
Included
Isolation valves and access to serviceable connections.
Plumbing test
Included
Included
Included
Included
Pressure/leak testing before concealed work is closed.
Pipe brands
Approved list
Approved list
Approved list
Approved list
Supreme, Astral, Ashirvad or approved equivalent. Pipe class and diameter suited to application.
Fixtures material allowance (INR/bathroom)
18000
28000
45000
75000
Sanitaryware and taps; standard installation included separately.
WC selection
Floor-mounted
Floor/wall-mounted within allowance
Wall-mounted where agreed
Selected premium model

Basin selection
Wall-hung/pedestal
Selected standard basin
Countertop basin
Selected premium basin

Shower controls
Standard mixer
Upgraded mixer
Diverter system
Selected premium system

Included fixture set
Included
Included
Included
Included
WC with seat/cistern or selected concealed tank, basin/tap, shower/mixer or diverter, health faucet, angle valves and agreed basic accessory set.
Bathroom mirror
Standard mirror
Standard mirror
Within fixture allowance
Selected mirror within fixture allowance

Vanity installed allowance (INR/bathroom)
Excluded
Excluded
Optional
20000
Signature: per contracted bathroom.
Shower enclosure installed allowance (INR/bathroom)
Excluded
Excluded
Optional
25000
Signature: per contracted bathroom; approved suitable glazing and hardware.
Bathroom quantity basis
Up to 3
Up to 3
Up to 3
Up to 3
Initial budget covers up to three bathrooms for one dwelling. Final count, sizes, powder rooms, pipe routes and utility fixtures fixed in quotation.
Bathroom/plumbing exclusions
Excluded
Excluded
Excluded
Excluded
Bathtubs, steam rooms, body jets, special pressure systems, geysers, heaters, softeners and external sewer development.

08 Waterproofing and water storage

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Terrace waterproofing
Included
Included
Included
Included
Appropriate waterproofing system, slopes, outlets and drainage.
Bathroom waterproofing
Included
Included
Included
Included
Floors with required wall upturns and treatment of wet-area junctions.
Other wet areas
Included
Included
Included
Included
Sunken portions, balconies and utility wet areas where present.
Waterproofing detailing
Included
Included
Included
Included
Pipe penetrations, outlets, joints and junctions. Protect treatment during later work.
Tank waterproofing
Included
Included
Included
Included
Included underground tank treatment.
Waterproofing tests
Included
Included
Included
Included
Recorded ponding/leak tests where appropriate.
Waterproofing products
Approved system
Approved system
Approved system
Approved system
Dr. Fixit, Fosroc, Sika or another approved manufacturer system selected for substrate/application. An additive alone is not a complete system.
Underground tank capacity (litres)
6000
6000
7000
8000
One tank. Construction/support follows approved design.
Overhead tank capacity (litres)
1000
1500
2000
2000
One approved food-grade multilayer tank. Supporting structure as designed.
Domestic transfer pump installed allowance (INR)
Optional
Optional
Optional
15000
Signature: one pump; automatic level control included within this allowance.
Automatic level control
Optional
Optional
Optional
Within pump allowance

Rainwater recharge
Optional
One suitable arrangement
One suitable arrangement
One suitable arrangement
Subject to site suitability and an agreed design.
Water-system exclusions
Excluded
Excluded
Excluded
Excluded
Borewell, borewell pump, commercial treatment plant, pool waterproofing, unusually deep tanks and water-treatment equipment.

09 Electrical installation and provisions

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Concealed electrical works
Included
Included
Included
Included
Approved copper wiring, conduits, modular switches and sockets.
Distribution and protection
Included
Included
Included
Included
Distribution board and appropriately selected protective devices. Separate circuits for high-load appliances.
Earthing and bonding
Included
Included
Included
Included
Designed for installation requirements, included in every tier.
Electrical tests
Included
Included
Included
Included
Testing and circuit identification at handover.
Wire brands
Approved list
Approved list
Approved list
Approved list
Polycab, Finolex, KEI, Havells or specifically approved compliant alternative.
Design basis
Same safety requirement
Same safety requirement
Same safety requirement
Same safety requirement
Cable sizes, protection and earthing follow electrical design, not decorative finish budget.
Switch range
Standard modular
Mid-range modular
Premium modular
Selected premium range

Suggested switch brands
Anchor/Havells
Anchor/Havells/GM
Legrand/Schneider/Havells
Legrand/Schneider or approved alternative

AC electrical points
Included
Included
Included
Included
Agreed bedrooms and living room.
AC drains and sleeves
Included
Included
Included
Included
Included at agreed locations.
AC refrigerant copper piping
Excluded
Excluded
Optional
Separately quoted

Inverter circuit provision
Included
Included
Included
Included
Circuit provision included. Inverter and batteries excluded.
Solar conduits
Included
Included
Included
Included
Conduit provision included. Panels, inverter and solar equipment excluded.
CCTV/data conduits
Optional
Basic routes
Agreed routes
Agreed routes

Lights and fans installed allowance (INR)
Excluded
Excluded
40000
100000
Only agreed standard fixtures within allowance.
Smart-home installed allowance (INR)
Excluded
Excluded
Optional
75000
Signature: selected lighting controls, video doorbell, controller and listed compatible devices; setup/demo included.
Electrical exclusions
Excluded
Excluded
Excluded
Excluded
Utility meter/deposits/connections/transformer, AC machines, inverter/batteries, solar equipment, generator, EV charger, CCTV hardware unless listed, networking, internet/subscriptions and extra automation.

10 Base electrical point schedule

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Each bedroom
Budgeted points
Budgeted points
Budgeted points
Budgeted points
2 light points, 1 fan point, 3 general sockets and 1 AC point.
Living/dining
Budgeted points
Budgeted points
Budgeted points
Budgeted points
4 light points, 2 fan points, 4 general sockets, 1 AC point and TV/data provision.
Kitchen
Budgeted points
Budgeted points
Budgeted points
Budgeted points
2 light points, exhaust/chimney point, refrigerator point, RO point and 4 appliance sockets.
Each bathroom
Budgeted points
Budgeted points
Budgeted points
Budgeted points
2 light points, exhaust point and geyser point.
Utility
Budgeted points
Budgeted points
Budgeted points
Budgeted points
Light point and washing-machine point.
Staircase
Budgeted points
Budgeted points
Budgeted points
Budgeted points
Lights with suitable two-way switching.
Terrace/parking
Scheduled points
Scheduled points
Scheduled points
Scheduled points
Agreed lights and weather-protected service sockets.
Schedule precedence
Final schedule governs
Final schedule governs
Final schedule governs
Final schedule governs
Final signed electrical point schedule replaces this budgeting example. Additional points require written costing.

11 Painting and surface finishes

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Internal preparation
Suitable preparation, putty and primer
Suitable preparation, putty and primer
Suitable preparation, putty and primer
Enhanced preparation where selected finish requires

Interior paint
Standard acrylic emulsion
Washable premium emulsion
Premium washable/low-sheen range
Selected luxury emulsion

Exterior paint
Weather-resistant emulsion
Upgraded weather-resistant range
Premium exterior coating
Selected premium exterior system

Metal finish
Preparation, primer and enamel
Preparation, primer and enamel
Selected finish
Selected finish

Wood finish
Specified doors only
Specified doors only
Specified veneer/polish finish
Specified premium finish

Decorative textures
Optional
Optional
Within facade allowance
Within facade allowance

Suggested paint brands
Approved list
Approved list
Approved list
Approved list
Asian Paints, Berger, Dulux, JSW Paints or approved alternatives.
Application schedule
Product-specific
Product-specific
Product-specific
Product-specific
Typical: two putty coats, one primer coat and two finish coats. Preparation/application follow selected product requirements.
Painting exclusions
Excluded
Excluded
Excluded
Excluded
Wallpapers, murals, specialist decorative coatings, extensive paneling and damage from later alterations/misuse.
Paint performance claims
Separate warranties
Separate warranties
Separate warranties
Separate warranties
Manufacturer advertised performance period is not an Earthen Home warranty.

12 Fabrication, railings and facade

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Window grill design
Agreed basic MS
Agreed upgraded MS
Selected MS
Selected MS

Grill installed allowance (INR/sq ft)
150
200
250
350
Actual area per approved drawings.
Stair railing installed allowance (INR/running ft)
700
1000
1600
2500
Actual railing length per approved drawings.
Balcony railing installed allowance (INR/running ft)
800
1200
1800
2800
Actual railing length per approved drawings.
Terrace access door
One where required
One where required
One where required
One where required
One standard door where required.
Basic facade finish
Included
Included
Included
Included
Approved basic facade plaster and paint.
Decorative facade installed allowance (INR)
Excluded
Optional
75000
200000
Identified surfaces and treatments only. Higher-tier allowance replaces lower-tier allowance.
Main property gate
Optional
Optional
Optional
Optional
Not part of base package.
Courtyard/OTS cover
Optional
Optional
Optional
Optional
Not part of base package.
Glass railings
Engineered system
Engineered system
Engineered system
Engineered system
Glass type/thickness, anchoring and loading require engineered selection, not allowance-only selection.
Stainless steel specification
Written specification
Written specification
Written specification
Written specification
Grade and section thickness recorded in quotation.
Fabrication exclusions
Excluded
Excluded
Excluded
Excluded
Boundary walls, gate automation, pergolas, structural canopies, elaborate screens, large skylights and decorative exterior lighting unless listed.

13 Interiors and outdoor features

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Wardrobes installed allowance (INR)
Optional
Optional
Optional
200000
Total for the dwelling, not per bedroom. Materials/hardware/labour/finish per approved cabinetry schedule.
False-ceiling coverage
0
0
25%
60%
Optional in Essential/Comfort; zero indicates no base coverage. Percentage of enclosed ceiling area.
False-ceiling installed allowance (INR/sq ft)
Not included
Not included
120
160
Gypsum ceiling for contracted area; excludes lighting fixtures beyond separate allowance.
Ceiling design
Optional
Optional
Standard flat/cove
Agreed coordinated design

TV units/pooja cabinetry
Optional
Optional
Optional
Optional
Not included in base scope.
Curtains and loose furniture
Excluded
Excluded
Excluded
Excluded
Not included.
Landscape design consultation
Optional
Optional
Optional
Included

Landscape execution
Optional
Optional
Optional
Optional
Actual execution separately quoted.
Outdoor services
Scheduled points
Scheduled points
Scheduled points
Scheduled points
Only agreed water/electrical points, no unlisted external network.
Lift shaft, lift and pool
Excluded
Excluded
Excluded
Excluded
Separately designed and priced; excluded from base rate.
Interior allowance basis
Installed budgets
Installed budgets
Installed budgets
Installed budgets
Installed allowances include agreed materials, hardware, labour and finishing. Higher-tier budgets replace lower-tier budgets.

14 Project management, inspection and handover

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Project coordinator
Included
Included
Included
Included
One named point of contact.
Project programme
Included
Included
Included
Included
Construction milestone programme and selection deadlines.
Site supervision
Included
Included
Included
Included
Supervision during execution; architect/structural engineer reviews at agreed stages.
Progress reporting
Included
Included
Included
Included
Weekly photographs and written status update.
Material records
Included
Included
Included
Included
Material approvals and finish selections recorded.
Inspection hold points
Included
Included
Included
Included
Before concrete pours and before concealed services are closed.
Test records
Included
Included
Included
Included
Relevant tests and corrective-action records.
Variations
Included
Included
Included
Included
Written cost/time approval before executing changes.
Pre-handover inspection
Included
Included
Included
Included
Joint inspection and documented snag list.
Cleaning
Included
Included
Included
Included
Construction debris removal and standard final cleaning.
Handover documents
Included
Included
Included
Included
Available test records, drawings, manuals and manufacturer warranty documents.
Homeowner review frequency
Monthly
Monthly
Fortnightly
Fortnightly

Finish coordination
Basic
Scheduled
Detailed
Room-wise

Interior-trade coordination
Optional
Optional
Contracted interiors included
Contracted interiors included

Equipment demonstration
Included
Included
Included
Included
Included equipment only.
Claims and commitments
Documented commitments
Documented commitments
Documented commitments
Documented commitments
Do not claim a specific check count or zero delays without documented process and contractual basis.

15 Package inclusions and exclusions at a glance

Item / specification
Essential Home
Comfort Home
Premium Home
Signature Luxury
Scope, limits and conditions
Primary inclusions
Design, engineered structure, waterproofing, termite treatment, flooring, bathrooms, kitchen counter/sink, doors/windows, electrical, plumbing, paint, supervision and handover.
Common construction plus upgraded floors/fixtures, doors/windows, washable paint, larger kitchen-counter allowance, service provisions and suitable recharge arrangement.
Premium finishes, selected interior design, kitchen cabinetry, partial ceiling, decorative facade and lights/fans within budgets.
Bespoke design, higher finish budgets, kitchen, wardrobes, extended ceilings, vanity/enclosure budgets, selected smart controls, lighting and landscape consultation.

Tier-specific exclusions
Kitchen cabinetry, wardrobes, ceilings, decorative facade, lights/fans, automation and appliances.
Kitchen cabinetry, wardrobes, ceilings, installed automation, lights/fans and appliances.
Wardrobes, AC equipment, kitchen appliances, installed automation and luxury imported finishes.
Loose furniture, appliances, central AC, pool, lift, landscape execution and imported finishes above allowance.
All tiers are also subject to complete common exclusions and signed-quotation quantities.
Customization
Upgrade individual finishes through written price adjustment.
Add cabinetry, selected ceilings or security equipment through separately priced options.
Add wardrobes, quartz/stone finishes or installed security with approved budgets.
Separately price lifts, pool, solar, central AC, landscaping and advanced automation.

Important: All monetary allowances exclude applicable taxes. Material-only allowances are not the same as installed allowances. Higher-tier specifications replace lower-tier allowances rather than adding to them. Only items and quantities in the signed quotation are contractually included.

Oct 22nd, 2026 3:43 PM